Estimated Building Costs

Unfinished Lot - Purchase Price $200,000

General Building Expenses: $484,000 - $550,000 (Estimate based on 2,200 Sq ft build)

  1. Additional costs associated with the build will be leveling and clearing the lot. (Estimated Costs $15,000 - $20,000)

    • Level and fill the back of the lot (Most Expensive)​

    • Do a graded back and possible add a small retaining wall.

  2. Flores Design - Stock plans 1,500 to 2,200 to custom plans 5,000

  3. ​​Current building costs in 2023 can range from $220 to $250 per square foot (2021 Allowances Below)​​

    • Lot Clearing, Site Work, and Fill: $ 15,000 Allowance

    • Landscaping (Sod, Irrigation, Landscaping): $ 9,500 Allowance

    • Driveway, Walkway, & house pad (no approved Site Plan): $ 16,500 Allowance

    • Appliances (delivery, installation, warranty): $8,500 Allowance

    • Kitchen cabinets and Countertop with install: $20,000 Allowance

    • General Conditions (permits, dumpsters, porto-lets, etc): $17,500

    • Framing and Roof: $165,000

    • Windows and Doors: $30,000

    • Siding and Decks: $50,000

    • Mechanicals and Tradesmen: $80,000

    • Stairs and Flooring: $35,000

    • Insulation, Drywall, Fixtures, Paint, etc.: 90,000

  4. Add-On Costs
    • ​Salt Pool, pool deck, and pool fence: $50,000​
    • Trek Decking
    • Upgraded Louvers: 
    • Firepit: $10,000
    • Bocce Court: $10,000
    • Game Room Arcade: $3,000
    • Hot Tub: $7,500
    • Light Fixture's: $4,000
    • Water pump: $3,500
    • Pool Heater: $7,500
    • 24kw Generac Generator: $11,500
    • Propane or Natural Gas Hookup
  5. Furnishing Items
    • Town Garbage Cans​